ST107 SALEM TPK over WATER PINES RIVER

1.4 KM NE OF RTE 60 · County 025, Massachusetts · Built 2011 · 4 Lanes · 35,302 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
R050077L5DOTNBI
Year Built
2011
Length
46.4 m (152.2 ft)
Max Span
17.8 m
Width
26.7 m (87.6 ft)
Lanes
4
Daily Traffic
35,302
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,599,000
Total Project Cost
$20,399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.