HWY REVERE ST over RR MBTA/BMRR

1.3 KM N JCT SR1A&60 · County 025, Massachusetts · Built 2008 · 2 Lanes · 12,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
R05011AYHDOTNBI
Year Built
2008
Length
27.8 m (91.2 ft)
Max Span
12.5 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
12,000
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,091,000
Total Project Cost
$1,637,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.