ST 1 A/LEE BRBNK over ST145 REVERE BCH PKWY
.5 MI SW OF JET SR 60&1A · County 025, Massachusetts · Built 1934 · 4 Lanes · 55,630 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
42.404364, -71.002869
This bridge is in worse condition than 90% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 92 years old.
Nearby Bridges
ST145 REV BCH PKWY over RR MBTA/BMRR
Built 1899
ST 1 A/LEE BRBNK over COMB ST16 & MBTA/BMRR
Built 1934
ST 1 A/LEE BRBNK over OTHER OIL PIPE TUNNEL
Built 1933
ST 1 A/VFW PKWY over RR MBTA/BMRR
Built 1932
ST 1 A/LEE BRBNK over OTHER OIL PIPE TUNNEL
Built 1933
HWY SHIRLEY AVE over TR BLUE LINE
Built 1953
HWY BEACH ST over TR BLUE LINE
Built 1938
ST 1 A/LEE BRBNK over OTHER OIL PIPE TUNNEL
Built 1934
ST145 REV BCH PKWY over COMB BLUE LN & STATE RD
Built 1933
ST 16 REV BCH PKWY over ST107 BROADWAY
Built 1931
Bridge Details
- Structure #
- R0501739BDOTNBI
- Year Built
- 1934
- Reconstructed
- 1975
- Length
- 41.4 m (135.8 ft)
- Max Span
- 22.6 m
- Width
- 24.3 m (79.7 ft)
- Lanes
- 4
- Daily Traffic
- 55,630
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,626,000
- Total Project Cost
- $9,940,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.