US 1 NE XWAY over US 1 RAMP & ST60

1 MI W OF ST-107 · County 025, Massachusetts · Built 1956 · 4 Lanes · 83,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
R050393ANDOTNBI
Year Built
1956
Length
147.2 m (482.9 ft)
Max Span
30.2 m
Width
27 m (88.6 ft)
Lanes
4
Daily Traffic
83,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$25,943,000
Total Project Cost
$38,915,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.