US 1 CUTLER HWY over COMB TRAIL & LINDEN CRK

.64 KM N OF ST-60 · County 025, Massachusetts · Built 1937 · 4 Lanes · 12,996 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
R050023AGDOTNBI
Year Built
1937
Reconstructed
1977
Length
42.3 m (138.8 ft)
Max Span
11.1 m
Width
24.3 m (79.7 ft)
Lanes
4
Daily Traffic
12,996
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,784,000
Total Project Cost
$10,177,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.