US 1 CUTLER HWY over WATER TOWN LINE BROOK

US-1 AT MM 53.6 · County 025, Massachusetts · Built 1957 · 4 Lanes · 89,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
R05061ATADOTNBI
Year Built
1957
Reconstructed
1999
Length
26.5 m (86.9 ft)
Max Span
3 m
Lanes
4
Daily Traffic
89,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,652,000
Total Project Cost
$2,479,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.