HWY PECKS RD over WATER ONOTA BROOK

.3 MI W OF RTE 7 · County 003, Massachusetts · Built 1988 · 2 Lanes · 3,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P10047023MUNNBI
Year Built
1988
Length
8.8 m (28.9 ft)
Max Span
7.4 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
3,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$589,000
Total Project Cost
$884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.