HWY HANCOCK RD over WATER W BR HOUSATONIC R
JUST S OF POTOOSUC LAKE · County 003, Massachusetts · Built 1996 · 2 Lanes · 6,078 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.484069, -73.246717
This bridge is in worse condition than 11.8% of bridges in County 003. The average bridge in Massachusetts is 0 years old; this one is 30 years old.
Nearby Bridges
HWY NEW RD over WATER W BR HOUSATONIC R
Built 2020
HWY WAHCONAH ST over WATER W BR HOUSATONIC R
Built 1951
HWY PECKS RD over WATER ONOTA BROOK
Built 1988
HWY PONTOOSUC over WATER W BR HOUSATONIC R
Built 1993
HWY LAKEWAY DR over WATER ONOTA LAKE
Built 2020
HWY WAHCONAH ST over WATER W BR HOUSATONIC R
Built 1970
HWY NARRAGANSETT over WATER PONTOOSUC LAKE
Built 2018
HWY BULLHILL RD over WATER PONTOOSUC LAKE
Built 1965
HWY 7/8 CONNECT over HWY PARTRIDGE RD
Built 1989
HWY MINER RD over WATER TOWN BROOK
Built 2012
Bridge Details
- Structure #
- P1004401MMUNNBI
- Year Built
- 1996
- Length
- 18.2 m (59.7 ft)
- Max Span
- 16.8 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 6,078
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,066,000
- Total Project Cost
- $1,600,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.