HWY 7/8 CONNECT over HWY PARTRIDGE RD

1.4 MI E OF US 7 · County 003, Massachusetts · Built 1989 · 2 Lanes · 10,474 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L03022589MUNNBI
Year Built
1989
Length
26.7 m (87.6 ft)
Max Span
24.2 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
10,474
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$1,809,000
Total Project Cost
$2,714,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.