HWY PUTNAM RD over WATER TOWN BROOK
200E OF JCT W/ MEADOW LN · County 003, Massachusetts · Built 2014 · 2 Lanes · 360 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
42.516144, -73.231964
This bridge is in worse condition than 11.8% of bridges in County 003. The average bridge in Massachusetts is 0 years old; this one is 12 years old.
Nearby Bridges
HWY BRIDGE ST over WATER TOWN BROOK
Built 1945
HWY MINER RD over WATER TOWN BROOK
Built 2012
HWY BULLHILL RD over WATER PONTOOSUC LAKE
Built 1965
HWY NARRAGANSETT over WATER PONTOOSUC LAKE
Built 2018
US 7 WILLMSTWN RD over WATER TOWN BROOK
Built 1948
HWY 7/8 CONNECT over HWY PARTRIDGE RD
Built 1989
HWY OLD STATE HW over OTHER ASHUWILLTICOOK RT
Built 1985
HWY HANCOCK RD over WATER W BR HOUSATONIC R
Built 1996
US 7 WILLMSTWN RD over WATER TOWN BROOK
Built 1961
HWY NEW RD over WATER W BR HOUSATONIC R
Built 2020
Bridge Details
- Structure #
- L03016BN3MUNNBI
- Year Built
- 2014
- Length
- 6.9 m (22.6 ft)
- Max Span
- 6.8 m
- Lanes
- 2
- Daily Traffic
- 360
- Material
- Aluminum, Wrought Iron, or Cast Iron
- Design
- Culvert
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $534,000
- Total Project Cost
- $802,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.