US 7 WILLMSTWN RD over WATER TOWN BROOK

0.2 MI N OF BAILEY RD · County 003, Massachusetts · Built 1948 · 2 Lanes · 5,806 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L0300209VDOTNBI
Year Built
1948
Length
10.4 m (34.1 ft)
Max Span
9.1 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
5,806
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,501,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.