HWY MINER RD over WATER TOWN BROOK

750 W. OF INT W/ ROUTE 7 · County 003, Massachusetts · Built 2012 · 2 Lanes · 129 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
L030099BKMUNNBI
Year Built
2012
Length
11.8 m (38.7 ft)
Max Span
10.7 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
129
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$804,000
Total Project Cost
$1,207,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.