HWY PONTOOSUC over WATER W BR HOUSATONIC R
@ WAHCONAH ST INTERSECTIO · County 003, Massachusetts · Built 1993 · 2 Lanes · 2,845 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
42.466558, -73.251978
This bridge is in worse condition than 88.7% of bridges in County 003. The average bridge in Massachusetts is 0 years old; this one is 33 years old.
Nearby Bridges
HWY WAHCONAH ST over WATER W BR HOUSATONIC R
Built 1970
HWY PECKS RD over WATER ONOTA BROOK
Built 1988
HWY WAHCONAH ST over WATER W BR HOUSATONIC R
Built 1951
HWY LINDEN ST over WATER W BR HOUSATONIC R
Built 1982
HWY NEW RD over WATER W BR HOUSATONIC R
Built 2020
HWY SECOND ST over RR CSX
Built 1999
US 7 FIRST ST over RR CSX
Built 1900
HWY NORTH ST over RR CSX
Built 1983
HWY COLUMBUS AVE over WATER W BR HOUSATONIC R
Built 1996
HWY LAKEWAY DR over WATER ONOTA LAKE
Built 2020
Bridge Details
- Structure #
- P10040025MUNNBI
- Year Built
- 1993
- Length
- 13.7 m (44.9 ft)
- Max Span
- 13.1 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,845
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,146,000
- Total Project Cost
- $1,720,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.