HWY NORTH ST over RR CSX

INT NORTH & COLMBS 150.25 · County 003, Massachusetts · Built 1983 · 6 Lanes · 20,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P100140DTDOT634
Year Built
1983
Length
14.9 m (48.9 ft)
Max Span
12.5 m
Width
33.2 m (108.9 ft)
Lanes
6
Daily Traffic
20,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,473,000
Total Project Cost
$2,210,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.