US 7 FIRST ST over RR CSX

S OF MELVLLE ST 150.09 · County 003, Massachusetts · Built 1900 · 2 Lanes · 29,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P100130DUDOT634
Year Built
1900
Reconstructed
1948
Length
18.6 m (61 ft)
Max Span
17.4 m
Width
17.3 m (56.8 ft)
Lanes
2
Daily Traffic
29,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,134,000
Total Project Cost
$3,202,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.