HWY MAIN ST LEED over WATER MILL RIVER

0.1 MI N OF ARCH ST · County 015, Massachusetts · Built 1925 · 2 Lanes · 2,008 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
N190450MLMUNNBI
Year Built
1925
Reconstructed
1989
Length
15.8 m (51.8 ft)
Max Span
15.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
2,008
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$883,000
Total Project Cost
$1,325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.