HWY MULBERRY ST over WATER MILL RIVER

AT MILL RIVER · County 015, Massachusetts · Built 1991 · 2 Lanes · 5,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N190280MFMUNNBI
Year Built
1991
Length
25.4 m (83.3 ft)
Max Span
24.4 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
5,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,975,000
Total Project Cost
$2,963,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.