HWY MAIN ST LEED over WATER SLUICEWAY

JCT ARCH ST · County 015, Massachusetts · Built 1850 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N190260MQMUNNBI
Year Built
1850
Reconstructed
1925
Length
9.4 m (30.8 ft)
Max Span
8.3 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$598,000
Total Project Cost
$898,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.