HWY MAIN ST LEED over WATER MILL RIVER

JCT ARCH ST · County 015, Massachusetts · Built 1925 · 2 Lanes · 1,500 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
N190260MPMUNNBI
Year Built
1925
Reconstructed
1993
Length
20.1 m (65.9 ft)
Max Span
20.1 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,500
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,854,000
Total Project Cost
$5,782,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.