HWY RIVER RD over WATER MILL RIVER

.08 M S WLLMSBRG TOWN-LIN · County 015, Massachusetts · Built 2012 · 2 Lanes · 1,571 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N19029B7PMUNNBI
Year Built
2012
Length
34 m (111.5 ft)
Max Span
31.5 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
1,571
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,654,000
Total Project Cost
$3,982,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.