HWY CHURCH ST over COMB I 90 & CSX/MBTA

.48 KM S. CHARLES RV S26 · County 017, Massachusetts · Built 1964 · 4 Lanes · 7,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
N120174R5DOTNBI
Year Built
1964
Length
55.5 m (182.1 ft)
Max Span
18.9 m
Width
22.6 m (74.1 ft)
Lanes
4
Daily Traffic
7,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,217,000
Total Project Cost
$12,326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.