I 90 over RR CSX/MBTA

.1 MI S. CHARLES RV S40 · County 017, Massachusetts · Built 1964 · 4 Lanes · 113,830 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
N120714RBDOTNBI
Year Built
1964
Length
55.5 m (182.1 ft)
Max Span
55.4 m
Width
35.6 m (116.8 ft)
Lanes
4
Daily Traffic
113,830
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,947,000
Total Project Cost
$19,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.