HWY ST JAMES ST over COMB I 90 & CSX/MBTA

AT INT 17 S33 · County 017, Massachusetts · Built 1964 · 2 Lanes · 12,802 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
N120134RADOTNBI
Year Built
1964
Reconstructed
1993
Length
84.4 m (276.9 ft)
Max Span
21 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
12,802
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,184,000
Total Project Cost
$18,277,000