HWY LEWIS TER over COMB I 90 & CSX/MBTA

.8 KM S. CHARLES RV S25 · County 017, Massachusetts · Built 1964 · 2 Lanes · 5,819 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
N120194R4DOTNBI
Year Built
1964
Reconstructed
1994
Length
58.8 m (192.9 ft)
Max Span
25.6 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
5,819
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,942,000
Total Project Cost
$7,414,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.