HWY HARVARD ST over COMB I 90 & CSX/MBTA

.8 KM S. CHARLES RV S24 · County 017, Massachusetts · Built 1964 · 2 Lanes · 3,879 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
N120204R3DOTNBI
Year Built
1964
Reconstructed
2010
Length
55.1 m (180.8 ft)
Max Span
21.5 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
3,879
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,690,000
Total Project Cost
$7,036,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.