ST 32 MAIN ST over WATER CHICOPEE BROOK

JCT. GREEN STREET · County 013, Massachusetts · Built 1956 · 2 Lanes · 13,706 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M270011A2DOTNBI
Year Built
1956
Length
19.3 m (63.3 ft)
Max Span
17.9 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
13,706
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$374,000
Total Project Cost
$562,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.