ST 32 MAIN ST over RR NECRR

0.1 M S JCT OF HIGH ST · County 013, Massachusetts · Built 1920 · 2 Lanes · 13,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
M270241ALDOT634
Year Built
1920
Reconstructed
1975
Length
7 m (23 ft)
Max Span
6.9 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
13,500
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$312,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.