HWY CUSHMAN ST over WATER CHICOPEE BROOK

E OF RT32 IN MONSON CTR · County 013, Massachusetts · Built 1939 · 2 Lanes · 258 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
M27002172MUNNBI
Year Built
1939
Length
13.7 m (44.9 ft)
Max Span
12.8 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
258
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$964,000
Total Project Cost
$1,447,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.