HWY CHESTNUT ST over WATER CHICOPEE BROOK

0.2 M E OF RT 32 · County 013, Massachusetts · Built 1993 · 2 Lanes · 1,163 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
M27021178MUNNBI
Year Built
1993
Length
9.5 m (31.2 ft)
Max Span
9.2 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
1,163
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$559,000
Total Project Cost
$839,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.