ST 32 MAIN ST over WATER CONANT BROOK

NEAR JCT. MAPLE STREET · County 013, Massachusetts · Built 1956 · 2 Lanes · 13,706 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
M270231A1DOTNBI
Year Built
1956
Length
12.8 m (42 ft)
Max Span
11.9 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
13,706
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$122,000
Total Project Cost
$184,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.