HWY NORTH ST over I 195

0.9 M N OF RTE 6 · County 023, Massachusetts · Built 1972 · 4 Lanes · 7,714 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
M09009482DOTNBI
Year Built
1972
Length
66.1 m (216.9 ft)
Max Span
32.3 m
Width
26.6 m (87.3 ft)
Lanes
4
Daily Traffic
7,714
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,571,000
Total Project Cost
$17,357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.