ST105 FRONT ST over I 195

.7 MI N OF US 6 · County 023, Massachusetts · Built 1971 · 4 Lanes · 5,971 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
M0500647XDOTNBI
Year Built
1971
Length
71.6 m (234.9 ft)
Max Span
34.7 m
Width
29.8 m (97.8 ft)
Lanes
4
Daily Traffic
5,971
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,930,000
Total Project Cost
$20,896,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.