US 6 MARION RD over WATER WEWEANTIC RIVER

2 MI E OF RTE 105 · County 023, Massachusetts · Built 1929 · 4 Lanes · 8,214 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
W0601645KDOTNBI
Year Built
1929
Reconstructed
1957
Length
45.2 m (148.3 ft)
Max Span
15.7 m
Width
17.9 m (58.7 ft)
Lanes
4
Daily Traffic
8,214
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,846,000
Total Project Cost
$19,270,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.