US 6 WAREHAM ROAD over WATER WEWEANTIC RIVER

AT WAREHAM MARION TL · County 023, Massachusetts · Built 1929 · 4 Lanes · 9,017 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
M0500145EDOTNBI
Year Built
1929
Reconstructed
1957
Length
33.2 m (108.9 ft)
Max Span
14.9 m
Width
17.9 m (58.7 ft)
Lanes
4
Daily Traffic
9,017
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,901,000
Total Project Cost
$14,852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.