I 195 WB over HWY POINT RD

0.5 M E OF RTE 105 · County 023, Massachusetts · Built 1971 · 2 Lanes · 17,571 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
M05007480DOTNBI
Year Built
1971
Length
25.9 m (85 ft)
Max Span
24.7 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
17,571
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,330,000
Total Project Cost
$3,496,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.