I 195 EB over WATER WEWEANTIC RIVER

3.3 M E OF RTE 105 · County 023, Massachusetts · Built 1971 · 2 Lanes · 17,349 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W0605048BDOTNBI
Year Built
1971
Length
37.5 m (123 ft)
Max Span
36 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
17,349
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$297,000
Total Project Cost
$446,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.