ST 28 CRANBRRY HWY over WATER PARKER MILL POND

1 MI S OF RTE 195 · County 023, Massachusetts · Built 1924 · 2 Lanes · 23,922 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W060194ALDOTNBI
Year Built
1924
Reconstructed
1932
Length
10.7 m (35.1 ft)
Max Span
9.1 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
23,922
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,057,000
Total Project Cost
$1,586,000