HWY MAIN ST over RR MACRR

0.7 M S OF RTE 195 · County 023, Massachusetts · Built 1985 · 2 Lanes · 19,525 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W060114C6DOT634
Year Built
1985
Length
19.8 m (65 ft)
Max Span
19.2 m
Width
16.1 m (52.8 ft)
Lanes
2
Daily Traffic
19,525
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$374,000
Total Project Cost
$562,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.