ST 63 LNG PLAIN RD over RR NECRR

2.1 M N AMHERST T.L. · County 011, Massachusetts · Built 2010 · 2 Lanes · 4,138 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L09011B2JDOT634
Year Built
2010
Length
58.8 m (192.9 ft)
Max Span
21.5 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
4,138
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$828,000
Total Project Cost
$1,243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.