HWY MILL ST over WATER MILL RIVER

0.5M E RT 63 BY DAM · County 015, Massachusetts · Built 2018 · 1 Lanes · 517 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
A08008BVRMUNNBI
Year Built
2018
Length
12.9 m (42.3 ft)
Max Span
11.4 m
Width
7.6 m (24.9 ft)
Lanes
1
Daily Traffic
517
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.