ST116 over WATER MILL RIVER

1.5 M S SUND-AMHERST T.L. · County 015, Massachusetts · Built 1958 · 2 Lanes · 9,285 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
A080250VADOTNBI
Year Built
1958
Length
19.6 m (64.3 ft)
Max Span
6.3 m
Lanes
2
Daily Traffic
9,285
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$345,000
Total Project Cost
$518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.