HWY ROOSEVELT ST over WATER MILL RIVER

0.5MI W OFRT116 · County 015, Massachusetts · Built 1958 · 2 Lanes · 5,100 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
H010200QCMUNNBI
Year Built
1958
Length
19.8 m (65 ft)
Max Span
6.3 m
Lanes
2
Daily Traffic
5,100
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,366,000
Total Project Cost
$2,050,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.