HWY RCKY HILL RD over ST116

.4 M W AMHERST T.L. · County 015, Massachusetts · Built 1958 · 2 Lanes · 12,931 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
H0101513ADOTNBI
Year Built
1958
Length
65.2 m (213.9 ft)
Max Span
19.3 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
12,931
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,314,000
Total Project Cost
$7,972,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.