HWY S EAST ST over WATER FORT RIVER

1.6 MI W PELHAM · County 015, Massachusetts · Built 1973 · 2 Lanes · 4,784 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
A080040L4MUNNBI
Year Built
1973
Length
20.6 m (67.6 ft)
Max Span
6.2 m
Lanes
2
Daily Traffic
4,784
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,029,000
Total Project Cost
$1,544,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.