HWY PELHAM RD over WATER FORT RIVER

0.9 MI W PELHAM TL · County 015, Massachusetts · Built 1929 · 2 Lanes · 11,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
A080060KYMUNNBI
Year Built
1929
Reconstructed
2014
Length
11 m (36.1 ft)
Max Span
4.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
11,250
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$818,000
Total Project Cost
$1,228,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.