HWY MEADOW ST over WATER MILL RIVER

AT JCT. ST. 116 · County 015, Massachusetts · Built 1958 · 2 Lanes · 10,474 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
A080280L3MUNNBI
Year Built
1958
Length
21.6 m (70.9 ft)
Max Span
7 m
Lanes
2
Daily Traffic
10,474
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,472,000
Total Project Cost
$2,209,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.