HWY STATE ST over WATER MILL RIVER

1M E OF RT63 @FCTRY HLLOW · County 015, Massachusetts · Built 1968 · 2 Lanes · 259 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
A080290PBMUNNBI
Year Built
1968
Length
15.2 m (49.9 ft)
Max Span
7.1 m
Lanes
2
Daily Traffic
259
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$670,000
Total Project Cost
$1,006,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.