HWY E LEVERET RD over WATER MOUNTAIN BROOK

0.2 M1 W SHUTESBURY TL · County 015, Massachusetts · Built 2008 · 2 Lanes · 2,456 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
A0802057DMUNNBI
Year Built
2008
Length
12 m (39.4 ft)
Max Span
11.6 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,456
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,074,000
Total Project Cost
$1,612,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.