HWY MILLERS RD over WATER ROARING BROOK

100 S OF SHUTESBURY RD · County 011, Massachusetts · Built 1960 · 1 Lanes · 10 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L090030QRMUNNBI
Year Built
1960
Reconstructed
1979
Length
14.3 m (46.9 ft)
Max Span
13.4 m
Width
4.1 m (13.5 ft)
Lanes
1
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$934,000
Total Project Cost
$1,402,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.