ST 2 over WATER N NASHUA RIVER
MM 100.6 0.2 E OF ST 13 · County 027, Massachusetts · Built 1951 · 4 Lanes · 65,083 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.534278, -71.739747
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 75 years old.
Nearby Bridges
ST 13 MAIN ST over ST 2
Built 1949
ST 13 MAIN ST over WATER N NASHUA RIVER
Built 1872
ST 2 WB over HWY NASHUA ST
Built 1975
I 190 SB & ST2 EB over HWY NASHUA ST
Built 1975
HWY HAMILTON ST over WATER N NASHUA RIVER
Built 1955
HWY WHITNEY ST over WATER MONOOSNOC BROOK
Built 2015
HWY HAMILTON ST over ST 2
Built 1949
HWY NASHUA ST over WATER N NASHUA RIVER
Built 1977
HWY WATER ST over WATER MONOOSNOC BROOK
Built 1984
I 190 NB over ST 2 EB
Built 1975
Bridge Details
- Structure #
- L080311NXDOTNBI
- Year Built
- 1951
- Length
- 47.9 m (157.2 ft)
- Max Span
- 22.9 m
- Width
- 26.2 m (86 ft)
- Lanes
- 4
- Daily Traffic
- 65,083
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,476,000
- Total Project Cost
- $12,715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.